Retail & Office

 Retail Projects

Down Arrow Icon

Retail Projects.

We have an established client base across the South Island with dedicated offices in Dunedin & Central Otago. We aim to ensure that our performance exceeds expectations and that we leave a positive outcome for our clients. Our clients range from Tertiary Institutes, local Government, Corporates, Private Building owners, Medical, Industrial, Consultants, Main Contractors & Sub-Contractors.



  • Office Passive Fire Protection

    Slide title

    Write your caption here
    Button

Montrose House

Contego has been contracted to provide Passive fire protection systems throughout the build of Montrose House, a brand new 3 story building. This includes top of fire wall junctions and timber purlin penetrations. Effective communication with site team and sub trades is crucial to ensure compliant details. Providing advice and direction to building and services trades to ensue excellent Passive Systems throughout the build


Tekapo Retail Building

Contego have been engaged by Cook Brothers to complete this new build in the heart of Tekapo village. The building is a mixed use retail & accommodation.

 

Close liaison with Cooks site team and readiness to drop everything to be on site when required are secret to the success of this build.


John Wickliffe House

Contego have been involved with John Wickliffe House & Plaza since 2016 as the preferred provider for Passive Fire Protection.
 
This 11 storey office building regularly has office fitouts & alterations including multiple government departments including DOC, Ministry of Social Development.
 
Contego have put in place a proactive managed upgrade of historical passive fire protection defects that can be completed with minimal disruption to tenants throughout this large office building.

ACC Preferred provider

Contego were approached by Project Managers Feldspar in mid-2019 to assist with this rapidly developing fitout & upgrade project. Due to tenant occupancy date there was not sufficient time for full design & the project was literally commencing as the design was commencing. Contego were engaged due to our ability to assist with the design of Passive Fire Protection in a fast pace environment as well as our ability to execute the work on the ground.

 

Contego worked alongside Feldspar & other trades to ensure this complex fitout & upgrade was completed in time for the >100 staff arriving for work.


Share by: