Blog Post

NZIQS 2018 Conference

Colm McGrath • May 24, 2018

Contego presenting at the NZIQS 2018 Conference

Dunedin Centre

 

Justin McEntyre of Contego will be presenting one of the breakout sessions on Passive Fire in the Fullwood Room, Dunedin Centre The conference will be held 13-15 June at the Dunedin Centre with accommodation and social options all within easy walking distance.

 

The committee has chosen the conference theme “Building a New Heritage”. We aim to explore the latest construction and services technologies which are helping to build a sustainable heritage for the future, whilst celebrating modern methods of re-purposing our existing historical buildings to allow them to stand as equals beside the new. The Otago Branch board are excited to host our NZIQS colleagues and take this opportunity to showcase all Dunedin has to offer. We are working hard to put together a not to be missed event ” – James Young, NZIQS 2018 Conference Committee Chair

 

Contego Passive Fire Protection
August 31, 2022
The Passive Fire Protection Intumescent Coating Code of Practice suggests that this should be a collaborative effort between all design consultants to ensure all aspects are considered. This way of thinking is no different to any other collaborative effort in designing a building whereby multiple consultants need to talk & collaborate on a solution.
Passive Fire Protection Checklist
July 31, 2022
Assessments – ask the extra questions. As most Passive Fire Protection contractors are aware AS1530.4 & AS4072.1 assessments satisfy compliance with NZBC and Acceptable solutions. However, when utilising an AS4072.1 assessment I would urge a little extra caution.
Passive Fire Protection
November 30, 2021
South Island passive fire protection contractor Contego today announced that it will continue its business expansion by opening a new base in the North Island in December 2021. Located in New Plymouth, the branch is expected to employ 10 persons over the next 24 months. The business currently employs 35 personnel between its bases across the South Island.
Passive Fire Protection
September 29, 2021
Our managing director, Justin McEntyre outlines our top 5 tips for managing your building compliance with regards to passive fire protection.
Intumescent Coatings
April 8, 2021
It has been a busy summer for the Intumescent coatings division with projects right across the lower South Island.
Contego Passive Fire
April 8, 2021
Sadly I am hearing more or more frictions within the industry between Passive Fire Contractors and consultants and Council inspectors.
Passive Fire Protection
April 7, 2021
I’m sure I’m not the only one that is experiencing weekly headaches with freight delays and lead time materials. What was once available down the road, can now be a lengthy delay to get a hold of it. The feedback I am getting from suppliers and contractors is that the worst is not over, and we should be planning to deal with this for the remainder of this year.
Passive Fire Products
February 23, 2021
With the current codes of practice and Passive products annual renewal being worked through the issue of Tested vs Assessed is constantly brought up in conversation. NZBC accepts the use of AS4072.1 Assessments as a way of showing compliance as an equal with a tested solution in accordance with AS1530.4.
Westpac Otago Business Awards
October 16, 2020
We are excited to announce that Contego have been selected as finalists within two categories at the 2020 Westpac Otago Business Awards. This year we have been selected as a finalist for the Excellence in Service Award and also the Future Business Leader Award.
Southern District Health Board
September 14, 2020
Contego is proud to announce that we have been awarded a 3 year contract to provide IQP services to SDHB for all Passive Fire Systems including SS15.2, SS15.3, SS15.4, and SS15.5.
More Posts
Share by: